Wellcraft V20 Community

Go Back   Wellcraft V20 Community > Wellcraft V-20 Forums > Modifications
Register FAQ Community Calendar Today's Posts Search

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #28  
Unread 01-25-2022, 12:56 PM
SkunkBoat's Avatar
SkunkBoat SkunkBoat is offline
God
 
Join Date: Mar 2010
Location: Manasquan Inlet, NJ
Posts: 1,913
Send a message via ICQ to SkunkBoat
Default

I put it next to the pivoting roller and cleat. It is big enough to pass chain.
I cut a hole into the bow anchor locker and siliconed in a piece of 4" landscape drain pipe.

The rode comes out on its own from the weight of the anchor/chain falling.
I hauled the rode onto the deck. If I was moving around I kept it on deck.
Deploying and hauling could be done standing in the open sliding hatch. Sometimes I even hauled it from way back on the main deck with the window open and laid the rode on the main deck.

When done for the day I hauled it below by hand thru the pipe down in the cabin.

That kept the cabin clear of a basket of line. 3/8" 3 strand. 1/4" chain

Before I had the deck pipe I ran it under the windshield, under the sliding hatch and into the cabin. I could actually have line there and still lock the hatch.
Attached Images
File Type: jpg skunkboat bow copy.jpg (84.8 KB, 15 views)
__________________
1984 V20 "Express" & 2003 Suzuki DF140 (SOLD!)
2000 GradyWhite 265 Express

YouTube/SkunkBoat https://www.youtube.com/channel/UC4F...znGospVOD6EJuw

Transom Rebuild https://www.youtube.com/watch?v=EEz94NbKCh0
https://www.youtube.com/watch?v=Oe_ZmPOUCNc

Last edited by SkunkBoat; 01-25-2022 at 01:02 PM.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 09:18 PM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.