![]() |
|
#28
|
||||
|
||||
|
I put it next to the pivoting roller and cleat. It is big enough to pass chain.
I cut a hole into the bow anchor locker and siliconed in a piece of 4" landscape drain pipe. The rode comes out on its own from the weight of the anchor/chain falling. I hauled the rode onto the deck. If I was moving around I kept it on deck. Deploying and hauling could be done standing in the open sliding hatch. Sometimes I even hauled it from way back on the main deck with the window open and laid the rode on the main deck. When done for the day I hauled it below by hand thru the pipe down in the cabin. That kept the cabin clear of a basket of line. 3/8" 3 strand. 1/4" chain Before I had the deck pipe I ran it under the windshield, under the sliding hatch and into the cabin. I could actually have line there and still lock the hatch.
__________________
1984 V20 "Express" & 2003 Suzuki DF140 (SOLD!) 2000 GradyWhite 265 Express YouTube/SkunkBoat https://www.youtube.com/channel/UC4F...znGospVOD6EJuw Transom Rebuild https://www.youtube.com/watch?v=EEz94NbKCh0 https://www.youtube.com/watch?v=Oe_ZmPOUCNc Last edited by SkunkBoat; 01-25-2022 at 01:02 PM. |
|
|