![]() |
|
#1
|
||||
|
||||
|
The Herbert C Bonner bridge that connects Oregon Inlet to Hatteras Island has been closed by NCDOT.
They were in the process of doing 2 million dollars in repairs to the bridge but decided it needed to be closed today at noon. Ferry's will be running starting tomorrow (Wednesday), You can read about here: http://pilotonline.com/2013/12/bonne...afety-concerns
__________________
Tis better to be quiet and thought a fool than open your mouth and prove it!! 1991 V-20 cuddy I/O 350 volvo duo prop, 1998 15ft Grumman 9.9 Johnson
|
|
#2
|
|||
|
|||
|
Thats really sad. I've been going across that bridge my whole life. We rode over to Pea Island about a month ago and I noticed a pretty bad dip over the channel. A friend dives around the bridge during dead tides and said you can swim under the pilings in the channel. Hopefully it can be repaired until a new bridge can be built.
__________________
77 V20 cuddy with 170 I/O Mercruiser 72 16ft. Carolina w/a 25hp Evinrude |
|
#3
|
||||
|
||||
|
Agree, very sad. I guess that makes it a true island now. I am amazed the bridge lasted as long as it has. Amazing they could build one in that inlet to begin with as volatile as it is.
__________________
1994 Wellcraft V21 |
|
#4
|
|||
|
|||
|
It was designed to last 30 years, so really in that spot its done really good! They are running ferrys from Stumpy Point to Rodanthe but I cant see them handling all that traffic. Its a bad situation.
__________________
77 V20 cuddy with 170 I/O Mercruiser 72 16ft. Carolina w/a 25hp Evinrude |
![]() |
|
|