Wellcraft V20 Community

Go Back   Wellcraft V20 Community > Wellcraft V-20 Forums > Modifications
Register FAQ Community Calendar Today's Posts Search

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #10  
Unread 05-12-2015, 07:27 PM
1224bret 1224bret is offline
Member
 
Join Date: Jul 2013
Location: Havana, Florida
Posts: 98
Default

Well I'm making some progress. Old transom cut out and new wood already cut to go in. Going to use 2 layers of 3/4 inch ply laid up with several layers of csm and 1708. Also going to run 2 small knee braces from the outer stringers up to the new section of transom and 2 more larger knee braces running from the old motor bed to the transom. Now if I can get a run of several days without rain I can get it all laid in. Don't really have a shop or barn to pull it into to do the work so it's very weather dependent.

Picked up a good used stainless marine bracket Saturday

Hopefully get this thing back on the water soon!
__________________
1983 wellcraft v20 steplift Mercury 250efi on the bracket!!!!
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 06:47 PM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.