Wellcraft V20 Community

Go Back   Wellcraft V20 Community > Wellcraft V-20 Forums > Repairs
Register FAQ Community Calendar Today's Posts Search

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #9  
Old 07-09-2012, 08:05 PM
tartuffe's Avatar
tartuffe tartuffe is offline
Senior Member
 
Join Date: Jan 2012
Location: Greenville, NC
Posts: 316
Default

I should have asked if you are going to cut the floor out or pop the cap off. As you said, you replace the transom then the stringers. Replacing one stringer at a time will be a PITA. Its nice to get down to a clean slate before you start building back.

Your looking at a project thats probably going to take 6 months minimum if you are doing it on your off time. Might as well set up for the long haul. Heck, 4 piers of cinderblocks 2 blocks high with 4x4's would work so long as you have a good stable work platform with lots of straight andeven support you'll be good. Set up as low to the ground as possible is recommended because you will be climbing in and out 100's of times. I've ripped the crotch out of at least 3 pair of jeans.
__________________
http://www.wellcraftv20.com/community/image.php?type=sigpic&userid=2362&dateline=1332379  966

81 V20 1996 200 Ocean Pro
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 11:41 AM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.