Quote:
	
	
		| 
					Originally Posted by Big Lar  I am in the process of installing a windlass.  The instructions say to run  #6 wire from the battery to the 80 amp breaker and continue wiring.
 My question is if currently I have  # 6 wires going into a fuse block, can I go from the main input line to the breaker thus avoiding the 15' wiring job which includes fishing wires etc.
 
 Of course, I will not go from a fuse but from the incoming lead.
 | 
	
 The existing #6 feed is for a fuse block, so you obviously have a pre-existing load on that wire. Probably best to run a dedicated feed from the battery for the windlass.