| 
 
			
			installed the GPS Fish Finder today and cut and painted the 3/4 ply for the covering of the storage box for the pedestal.  tomorrow I will get the boxes ready and after the next coat of paint will probably install them Friday.  the next 2 projects are the installation of the windlass and the installation of the live well.  I have a small 13" sink that I plan on installing above the live well and the system will also include a salt water wash down. THOSE PESKY FISHES CAN MAKE A MESS.
 My trailer problem has me concerned.  In order to move the axles there will most probably be a lot of cutting and welding required as there is no room under the fenders and the are no bolt holes in the trailer
 
 Having trouble with the pictures, have them in the system, but do not understand how to transfer them to the forum.
 |