Wellcraft V20 Community

Go Back   Wellcraft V20 Community > Wellcraft V-20 Forums > Repairs

Reply
 
Thread Tools Display Modes
  #1  
Unread 04-19-2006, 01:17 PM
Airslot's Avatar
Airslot Airslot is offline
God
 
Join Date: Feb 2003
Location: Greenbackville, VA
Posts: 3,954
Send a message via ICQ to Airslot
Default Re: Floor replacement question??

Here's another thought. Make your cut about 6" from the gunnel all the way around. If using 3/4" ply, build up the stringers by laying a piece of your 3/4 right on top of them. When you lay the new floor, lay it across the built up stringer and run it to about 2" from the gunnell, on top of the factory floor. Round over the outside edge of your new floor and you have a nice "drain channel all the way around your deck. My neighbor is a glass guy and he does most all his rebuilds this way. He also uses liquid nails to glue it down and uses drywall screws (glued and screwed) before he glasses over it.

Airslot
__________________
Airslot Airslot's V-20 Gallery
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 07:27 AM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.