![]() |
|
|
|
#1
|
||||
|
||||
|
To cold to pour or glass so it been triple check the leveling of the hull, stringer alignments/heights etc
Happy with the transom height, 24 5/8 right where we wanted it to be. Have to say these kids are rocking it! IMG_4622.jpg IMG_4627.jpg IMG_4629.jpg IMG_4641.jpg IMG_4630.jpg |
|
#2
|
||||
|
||||
|
Got back into the hull over the weekend now that the temps have come out of the teens at night.
How much seacast does it take to do a transom raise to 25" and stringers on a V20 ? 10 5gal pails, Figured it to be approx 10,000 cubic inches (little under, 9700 ish) However we came up about a gallon short due to me not informing the mathematician to figure the spine of the hull into the equation. The block of wood in the stern for the bilge pump was torn out and the area was built up with seacast and glassed in. IMG_5526.jpg IMG_5528.jpg IMG_E5524.jpg IMG_5471.jpg Last edited by Dana A; 03-09-2021 at 02:33 PM. |
|
#3
|
||||
|
||||
|
Fits like a glove ( not OJ’s)
D19E5B70-05D1-4091-9173-E90B6A808DC0.jpg 9255BFCA-3C9F-4D4B-8024-BDFE8D1D218F.jpg 10DD6A1E-3C1E-4A77-AE19-70679FA2E4D1.jpg 6498B23E-E5D1-4E72-8588-A5C13FA43EAC.jpg |
|
#4
|
||||
|
||||
|
Quote:
|
|
#5
|
||||
|
||||
|
Started playing with the liner, little modification to marry up to the transom
Stringers had 1/8 to 1/2 inch gaps filled with goop before we pulled the liner. Workmanship in the hull looks like it was started on a Monday and finished Friday afternoon. liner was a different team ! Set our forms on the stringers with the liner in, put in temporary now till the next batch of seacast arrives encasing the rod compartments in glass too IMG_5599.jpg IMG_5709.jpg IMG_5708.jpg IMG_5686.jpg |
|
#6
|
||||
|
||||
|
|
|
#7
|
|||
|
|||
One of the best V for 2021 for sure when you are done with this baby. I have to do my stringers one day, they a-ok for now
|
|
#8
|
||||
|
||||
|
A lot going on and not much time to post
Got the stringers done to height after putting the liner in for measurements, back off last night and hull moved into glass bays for capping off the stringers today Have decided to rework the liner too since were in this deep, pulling all hardware off it, new bulkheads and more. Restoring original teak. IMG_5967.jpg IMG_5975.jpg IMG_5719.jpg IMG_5760.jpg IMG_5821.jpg |
![]() |
| Thread Tools | |
| Display Modes | |
|
|