![]() |
|
|
|
#1
|
|||
|
|||
|
Kracker:
I recommend you dry your rigging thru that chase before you mount the deck. It looks relatively small in the pics with several 90 degree corners that may makes rigging a real pain. Especially if your going to use mechanical steering! Keep up the good work. Kamikaze
__________________
74 V20 CC with a 150 Johnson (Gone but not forgotten) 89 V20 Cutty with a Tower (Build in process) |
|
#2
|
||||
|
||||
|
Quote:
|
|
#3
|
||||
|
||||
|
Quote:
I noticed that pipe...was thinking instead of a single 90* elbow under the console, two 45s would make a much easier pull of it...I would think the steering cable would go thru that...
__________________
'74 V-20/ BF 150 '95 V-21/ BF 150 '84 V-20/ 200 2.4 Merc '87 V-20/'18 F150 Yamaha |
|
#4
|
||||
|
||||
The transom end is 2 sweeps together to make a broad 90 degree angle.The other ened was just a hope and a prayer. It really not to big of a deal beacause I have a plan B to run teleflex and controls
Last edited by Kracker Jack; 01-24-2012 at 01:01 PM. |
|
#5
|
||||
|
||||
|
Your work is great. I used a 4" chase but kept it inboard of the stringer, actually lays on top of the fuel tank in my center console.
__________________
1996 -19' NV Flats 115 Mercury 4-stroke 1983 -20' Wellcraft Center Console 250 XS |
|
#6
|
||||
|
||||
|
Ridge thanks for the compliments. I thought about running the Chase down the middle but I had to end up running the teleflex outboard of the stringer sooner or later to get the bend to attach to motor. The way I'm running it now allows the teleflex and controls to kinda relax alittle better.
|
|
#7
|
||||
|
||||
|
Looking good Matt!
__________________
1994 Wellcraft V21 |
![]() |
| Thread Tools | |
| Display Modes | |
|
|