View Single Post
  #63  
Unread 01-12-2018, 07:33 PM
Slightly_Twisted Slightly_Twisted is offline
Senior Member
 
Join Date: Nov 2007
Location: Bloomington, Indiana
Posts: 221
Default It’s been to damn cold to work on the boat

Well the cold up here has really slowed down the work.
I’ve been inside soldering wiring harnesses for the new deck lights.
This week was the first time I’ve been able to get outside.

So I went a little over kill on the wiring. The lights and bilge are soldered, two coats of liquid electrical tape, heat shrink tubing, then electrical tape over top. I pretested every connection to make sure I only ran the wires once.
Today I soldered the new led lights on. Four white deck lights, two on each side. And four blue lights hidden in the rod boxes. I’ll get photos of the blue ones when I put in the rod boxes.

Finished the new control panel, the large wooden space will get a flush mount 7 inch fish finder once I order one.


Stay warm
Attached Images
File Type: jpg 3E09993C-3E8A-4A2D-9DC1-C7CF56890037.jpg (19.3 KB, 24 views)
File Type: jpg 6439257D-5844-4D56-8D24-67F80296A8E7.jpg (19.3 KB, 25 views)
File Type: jpg F4503D7C-1032-4F45-9045-66E69A00A50B.jpg (19.9 KB, 24 views)
__________________


1986 V20 Cuddy in pieces



"WILD FINN"
Reply With Quote