Quote:
Originally Posted by bgreene
Now the tabs are installed, pump mounted, and the tubes connected.
Next the switch and wiring, then done. Slow installation.......like turtle
|
Nope...sorry...after switch and wiring comes filling w/fluid and priming the system up...then done...