Wellcraft V20 Community

Go Back   Wellcraft V20 Community > Wellcraft V-20 Forums > Repairs

Reply
Thread Tools Display Modes
  #21  
Unread 07-23-2009, 06:52 AM
Skools Out's Avatar
Skools Out Skools Out is offline
God
 
Join Date: Jul 2007
Location: Graham / Emerald Isle, NC
Posts: 5,926
Default

looks good
__________________




1978 V20 Cuddy w/ 225 Johnson. And Several other boat's
Reply With Quote
  #22  
Unread 07-26-2009, 08:42 PM
joe7670 joe7670 is offline
Senior Member
 
Join Date: Jul 2009
Location: Miami
Posts: 422
Default

Moving right along. Not as much done this weekend due to rain. Installed wood and put biaxial over it. Then prepped and reattached Fish box to the floor.

Prep floor joint, install Fuel lines and tank ground cabling are next.
Attached Images
File Type: jpg IMG_7746.jpg (28.9 KB, 51 views)
File Type: jpg IMG_7747.jpg (36.4 KB, 49 views)
File Type: jpg IMG_7748.jpg (36.3 KB, 53 views)
Reply With Quote
  #23  
Unread 07-31-2009, 10:49 PM
joe7670 joe7670 is offline
Senior Member
 
Join Date: Jul 2009
Location: Miami
Posts: 422
Default

Floor is in. Prepped edge with reinforcement to attach floor to per Skools recommendation.

Prepped tank with Coal Tar Epoxy and liquid nailed floor in.

Camera was incorrectly set and took some crapy shots of floor install progress, but here are a few of reinforcement and installed floor.
Attached Images
File Type: jpg IMG_7758.jpg (31.3 KB, 81 views)
File Type: jpg IMG_7760.jpg (42.0 KB, 82 views)
File Type: jpg IMG_7764.jpg (35.7 KB, 82 views)
File Type: jpg IMG_7786.jpg (27.1 KB, 83 views)
File Type: jpg IMG_7787.jpg (27.7 KB, 83 views)
Reply With Quote
  #24  
Unread 07-31-2009, 11:05 PM
nymack66 nymack66 is offline
God
 
Join Date: Jul 2007
Location: Orlando Florida
Posts: 1,069
Send a message via ICQ to nymack66
Default

Awesome job, You will enjoy the fruits of your hard work hang in there ..
Reply With Quote
  #25  
Unread 08-12-2009, 09:01 PM
joe7670 joe7670 is offline
Senior Member
 
Join Date: Jul 2009
Location: Miami
Posts: 422
Default

OK, pictures to show progress. Floor is in and tied in with class to the lip which was left. Just noticed that I don't have enough pics of that, but you can see part of it in the picture below.

Tank was hooked up and foamed tonight.

Also a few pics of the fuel hatch and live well which are getting repaired. Hatch was re-lined with ply and live well is getting the edge lip glassed to reinforce and fix some cracks.

Durabak paint arived and may be going on this weekend.
Attached Images
File Type: jpg IMG_7803.jpg (33.4 KB, 50 views)
File Type: jpg IMG_7804.jpg (51.0 KB, 50 views)
File Type: jpg IMG_7808.jpg (52.5 KB, 56 views)
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 03:02 PM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.