Wellcraft V20 Community

Go Back   Wellcraft V20 Community > Wellcraft V-20 Forums > Repairs

Reply
 
Thread Tools Display Modes
  #1  
Unread 05-28-2017, 08:13 PM
phatdaddy's Avatar
phatdaddy phatdaddy is offline
God
 
Join Date: Mar 2003
Location: south of I-10
Posts: 4,965
Default

never did like the way wellcraft had sheet metal screws holding down the hatch, too easy to strip out, kept loosening up, etc. decided to see if i could improve on this. screwed some aztec board to the stringers, going to drill and tap and put some 1/4-20 stainless screws in them. for the ones on the forward side i had to epoxy some starboard on the lip, bulkhead was to far away.

the "clamps" are pieces of 2" pvc, work great




when i changed out the tank 3 years ago, i had to cut the lip off one side. replaced it with aztec also



epoxy supplies should be here tuesday, tying to get it back together for snapper season,

all 3 days of it
Reply With Quote
  #2  
Unread 05-29-2017, 04:34 PM
wellcraftv20step wellcraftv20step is offline
Senior Member
 
Join Date: Jun 2011
Location: long island's south shore n y
Posts: 580
Default

Looks like it will work well phat, love the pvc clamp!!!!!
__________________
1988 Grady White Seafarer Yamaha 250 ox66 on a bracket
Reply With Quote
  #3  
Unread 06-03-2017, 05:49 PM
phatdaddy's Avatar
phatdaddy phatdaddy is offline
God
 
Join Date: Mar 2003
Location: south of I-10
Posts: 4,965
Default

supposed to rain today, so i started this phase:



well, weatherman lied, but i was already committed,



waiting on epoxy to cure now. not too happy with work, ply had more warp in it than i thought, hope i got a good bond
Reply With Quote
  #4  
Unread 07-05-2017, 11:01 AM
RidgeRunner's Avatar
RidgeRunner RidgeRunner is offline
God
 
Join Date: Aug 2009
Location: Lakeland, Fl
Posts: 2,526
Default

Weight, shoulda added weight to the plywood to press it into the adhesive. My .02 probably a little late now.
__________________

1996 -19' NV Flats 115 Mercury 4-stroke
1983 -20' Wellcraft Center Console 250 XS
Reply With Quote
  #5  
Unread 07-05-2017, 04:45 PM
SkunkBoat's Avatar
SkunkBoat SkunkBoat is offline
God
 
Join Date: Mar 2010
Location: Manasquan Inlet, NJ
Posts: 1,913
Send a message via ICQ to SkunkBoat
Default

Thats one reason why they use little squares instead of a full piece
__________________
1984 V20 "Express" & 2003 Suzuki DF140 (SOLD!)
2000 GradyWhite 265 Express

YouTube/SkunkBoat https://www.youtube.com/channel/UC4F...znGospVOD6EJuw

Transom Rebuild https://www.youtube.com/watch?v=EEz94NbKCh0
https://www.youtube.com/watch?v=Oe_ZmPOUCNc
Reply With Quote
  #6  
Unread 07-05-2017, 07:54 PM
phatdaddy's Avatar
phatdaddy phatdaddy is offline
God
 
Join Date: Mar 2003
Location: south of I-10
Posts: 4,965
Default

I did ridge, i had 6 five gallon buckets full of water, plus a couple of of battery cores and 100 lbs do lead ingots on it. I applied a thickened mixture of cabosil and epoxy on the hatch, wet out the ply and put it on the floor. Then stacked the weight on. Worked great. After that, a layer of 6oz cloth.

Solid as the deck of the kitty hawk now.

Exactly skunk. I was thinking about doing the squares again, but figured this was faster.

Worst part of the whole deal is my caulking.
Reply With Quote
  #7  
Unread 07-06-2017, 10:59 PM
RidgeRunner's Avatar
RidgeRunner RidgeRunner is offline
God
 
Join Date: Aug 2009
Location: Lakeland, Fl
Posts: 2,526
Default

LOL, cool. Weight will mash that plywood in nicely. Good job.
__________________

1996 -19' NV Flats 115 Mercury 4-stroke
1983 -20' Wellcraft Center Console 250 XS
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 11:42 AM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.