Wellcraft V20 Community

Go Back   Wellcraft V20 Community > Wellcraft V-20 Forums > Off Topic

Reply
 
Thread Tools Display Modes
  #1  
Unread 10-08-2014, 07:30 AM
RidgeRunner's Avatar
RidgeRunner RidgeRunner is offline
God
 
Join Date: Aug 2009
Location: Lakeland, Fl
Posts: 2,526
Default

Jamestown is $575 plus the ride. I think another thousand sounds about right

BOAThousand
__________________

1996 -19' NV Flats 115 Mercury 4-stroke
1983 -20' Wellcraft Center Console 250 XS
Reply With Quote
  #2  
Unread 10-08-2014, 09:42 PM
bradford's Avatar
bradford bradford is offline
God
 
Join Date: Nov 2006
Location: Wilmington Island, Georgia
Posts: 4,879
Talking

I've found a thousand isn't too bad, usually ends up being more.
__________________
1985 Wellcraft V-20, Evinrude ETEC 150: SOLD
1979 Marine Trader 44, twin Ford Lehman 120s
2006 Panga 14, Tohatsu 20
Reply With Quote
  #3  
Unread 10-09-2014, 09:05 AM
RidgeRunner's Avatar
RidgeRunner RidgeRunner is offline
God
 
Join Date: Aug 2009
Location: Lakeland, Fl
Posts: 2,526
Default

That is SPIN right there. The bright side is it will be a thousand or less.

Got it.. Train the brain
__________________

1996 -19' NV Flats 115 Mercury 4-stroke
1983 -20' Wellcraft Center Console 250 XS
Reply With Quote
  #4  
Unread 10-13-2014, 09:48 AM
RidgeRunner's Avatar
RidgeRunner RidgeRunner is offline
God
 
Join Date: Aug 2009
Location: Lakeland, Fl
Posts: 2,526
Default

New steering installed and it took out all but the smallest of play in the steering. Lake test revealed that the issue where the boat was misbehaving has been resolved. Speed run of 46 mph with two people on board. Ferman, I didn't get to lake test your props yet. With the additional person I could tell the holeshot was a little slower and the lowest speed to stay on plane went up to 13.5 mph.
A quick snapshot at cruise of
30MPH 4GPH Fuel burn for 7.5MPG -- That is what the Mercury tests showed for 3500 rpm on their test mules too..
What a PITA taking out the old steering. As I already suspected there were no place to tie wires once the old cable and head were out of the way. I cut and fit a 6"tall x 30"wide piece of 1/2" Starboard with 15 ty-wrap holders and a place to mount the junction box. From there I cut all the old wire ties and straighted out each and every harness for the third or fourth time now. (LAST I HOPE) I am so happy I took the extra time to do so as it is the best rendition yet... Now it is FN DONE I said it. Labor of love the first time. Second time, not so much.
__________________

1996 -19' NV Flats 115 Mercury 4-stroke
1983 -20' Wellcraft Center Console 250 XS
Reply With Quote
  #5  
Unread 10-13-2014, 05:00 PM
bradford's Avatar
bradford bradford is offline
God
 
Join Date: Nov 2006
Location: Wilmington Island, Georgia
Posts: 4,879
Thumbs up

Glad to hear she's coming together for you Ridge.
__________________
1985 Wellcraft V-20, Evinrude ETEC 150: SOLD
1979 Marine Trader 44, twin Ford Lehman 120s
2006 Panga 14, Tohatsu 20
Reply With Quote
  #6  
Unread 10-14-2014, 08:04 AM
RidgeRunner's Avatar
RidgeRunner RidgeRunner is offline
God
 
Join Date: Aug 2009
Location: Lakeland, Fl
Posts: 2,526
Default

I see that there were a few people checking out this thread. I get wordy fast as you know. ??IDK what to say??
Thanks Bradford. Yes it is coming together. Save for the all important prop selection. I know you can appreciate the feeling of accomplishment you have at the end of a project. When the late and over-budget object of my wonderlust has had the last screw tightened and hatch battened, THEN WHAT?

I TELL YOU WHAT>> SEE YOU IN THE FISHIN SECTION...
__________________

1996 -19' NV Flats 115 Mercury 4-stroke
1983 -20' Wellcraft Center Console 250 XS
Reply With Quote
  #7  
Unread 10-14-2014, 10:39 AM
bradford's Avatar
bradford bradford is offline
God
 
Join Date: Nov 2006
Location: Wilmington Island, Georgia
Posts: 4,879
Default

I've found that they are never really completely finished. Always something new to add. I still need to install nav lights, finally just installed a new gps/sounder, it's almost time to redo the varnish on some of the teak, and I'm thinking about swapping my bow rail for the two piece one off the Chris Craft to work better with the bow pulpit. Want to put my deck drains through the back of the liner too instead of through the deck, and also add some hatches to give better access to the drains and scuppers.

Nothing but time and money, break out another thousand. The important thing is she's usable!
__________________
1985 Wellcraft V-20, Evinrude ETEC 150: SOLD
1979 Marine Trader 44, twin Ford Lehman 120s
2006 Panga 14, Tohatsu 20
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 12:53 AM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.