Wellcraft V20 Community

Go Back   Wellcraft V20 Community > Wellcraft V-20 Forums > General

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #33  
Unread 10-07-2014, 10:21 PM
peiserma peiserma is offline
Member
 
Join Date: Aug 2010
Location: Wilmington, NC
Posts: 82
Default

Quote:
Originally Posted by smokeonthewater View Post
Honestly I have to admit..... while I can't suggest it to anyone else as it is officially a BAD idea I would probably just run the 150 hp pre made plate.... Jus sayin
I understand the sentiment, but I am an (electronics) engineer working in the nuclear power industry. My design comfort level starts in the 30% to 50% margin range, and if I can talk people into a more robust solution, I will. Then I add a backup system. Actually, we like four backup systems for anything really critical.

It may work just fine for a long time. I understand perfectly well that T&H designed in margin, but I could never sleep well at night using something beyond rated capacity. Fukushima got hit by almost 10x worse than it was designed for, which has no bearing on this topic, but it does reinforce the idea that safety can never have enough margin.

While I appreciate the viewpoint, I'd never be comfortable with it
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 09:23 AM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.