Wellcraft V20 Community

Go Back   Wellcraft V20 Community > Wellcraft V-20 Forums > General

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #20  
Old 01-10-2012, 07:39 PM
Kracker Jack's Avatar
Kracker Jack Kracker Jack is offline
God
 
Join Date: Aug 2011
Location: va beach
Posts: 1,753
Default

The stringers are finally done and my last layer of 1708 is on the transom. All i have to do is put some thickened resin in the stringer drain holes then drill the holes 1 inch( I over drilled the holes 1 1/2 inch) to allow for a solid ring of glass around the drains to protect the raw wood. I also drilled my garboard plug a 1 1/2 and then used thickened resin reinforced with some chopped glass to fill the hole back and then drilled it 1 inch. A little more prep and then im ready for the sole. What should I do to water proof the bottom side of my 3/4 inch ply for my sole? 1 layer of csm?or should I just simply hotcoat it?
Attached Images
File Type: jpg 11.JPG (39.1 KB, 89 views)
File Type: jpg 9.JPG (33.1 KB, 87 views)
File Type: jpg 10.JPG (27.1 KB, 90 views)
File Type: jpg 7.JPG (32.1 KB, 104 views)
File Type: jpg 8.JPG (38.0 KB, 90 views)
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 07:47 AM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.