Wellcraft V20 Community

Go Back   Wellcraft V20 Community > Wellcraft V-20 Forums > Repairs

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #3  
Unread 05-16-2009, 05:32 AM
tsubaki's Avatar
tsubaki tsubaki is offline
God
 
Join Date: Mar 2007
Location: Savannah
Posts: 4,971
Send a message via ICQ to tsubaki
Default

For the amount of work you are planning to get into, think about the project as a whole.
You are toying with mounting the batteries up front, you may want a sleeve (pvc pipe) for the wires to go to that location beneath the floor instead of hanging them with the rest of the wires and steering, that cable will be awfully heavy.
While cutting the floor and back splash to access the stringers you might want to look at the possibility of modifying for a bench seat, keeping in mind about regular access to the bilge pump(s) and drain plug. Also look at the permanent fuel tanks that may be hidden in that location if replacing the saddle tanks become an issue.
Here are some for standard dimensions.
http://www.moellermarine.com/afterma...rmanent_tanks/
reelapeelin has his tanks in the seat boxes. If you rather have that setup, add a sleeve at those locations also.

And PLEASE take pictures as you do whatever you do.
__________________

'75 Cuddy with '00 Johnson Ocean Pro 150 horse

Benny



Last edited by tsubaki; 05-16-2009 at 05:43 AM.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 03:21 PM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.