Wellcraft V20 Community

Go Back   Wellcraft V20 Community > Wellcraft V-20 Forums > Repairs
Register FAQ Community Calendar Today's Posts Search

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #31  
Unread 08-05-2019, 07:19 AM
Pipe_Dream's Avatar
Pipe_Dream Pipe_Dream is offline
God
 
Join Date: Jan 2004
Location: Hilton Head Island
Posts: 4,133
Default

Quote:
Originally Posted by Slightly_Twisted View Post
I’ve left the transom to fully cure, and have been working on the stringers.
Trying to get it right the first time I spent a few days measuring and re-measuring. I think I got everything where I want/need it so I cut the stringers.
They Came out good just need to fine tune them. The joint I decided I suck a scarf joints so I used what I call a saw tooth joint (not the right name). I decided to make the interlocking teeth 8in then glue them with peanut butter. The process wasn’t the bad just I was over measuring everything so I didn’t waste and plywood.

Hoping to have time this weekend to mock fit the stringers, bulkheads, and outside wedge pieces. Once I get things close I have to wait until the 16th to glass them in. I only have 1 or 2 gallons of resin left I know that’s enough for at least one side, but I really want to wait until I get another 5 gallons.

I’m planning on getting each stringer 100% glassed in one sitting to get a chemical bond throughout the whole stringer to boat connection.
Nice work!
__________________
1983 V20 Steplift Cuddy, w/2018 Suzuki 175
Pipe Dream pics
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 03:34 PM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.