Wellcraft V20 Community

Go Back   Wellcraft V20 Community > Wellcraft V-20 Forums > Repairs
Register FAQ Community Calendar Today's Posts Search

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #4  
Unread 08-08-2010, 04:32 PM
Brody Brody is offline
Junior Member
 
Join Date: Oct 2009
Location: South East PA
Posts: 12
Default First Arjay pour

I elected to not raise the transom height due to added weight. Here is the pictures after the first pour. I am going to finish the rest with a second pour this week. I am going to drill several holes into the Arjay after it is set up so it forms a keyed fit for the second pour. I was attempting to do everthing at one time but there was no way I could block this with forms, It would have been a disaster. I had several small unseen cracks that leaked into the bilge and was a mess until it started to set up. After that mess I did not even attempt the forms and duct tape for the sides.

I am going to glass over the sides and drill several holes for venting air before the second pour. I will post final pics later.
Attached Images
File Type: jpg First pour 8-6-10 184.JPG (46.2 KB, 88 views)
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 08:11 PM.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.