![]()  | 
	
| 
		 
			 
			#9  
			
			
			
			
			
		 
		
	 | 
||||
		
		
  | 
||||
| 
		
	
		
		
			
			 
			
			It took about 4 1/2 hours to do. Probably could have cut some time off that if I had some help. This one is the Tessilmare Radial Flexible Rub Rail from Jamestown Distributors. Once the track is on the rub rail itself goes on in 10 minutes. I am quite pleased with the look of it so far.
		 
		
		
		
		
		
		
			
				__________________ 
		
		
		
		
		
	
	1994 V-21 Cuddy  | 
| Thread Tools | |
| Display Modes | |
		
  | 
	
		
  |