|  | 
| 
			 
			#1  
			
			
			
			
			
		 | ||||
| 
 | ||||
|  More work in progress 
			
			FEEL FREE TO COMMENT The deck is just about ready to paint, put in new hatches on either side of the engine box, go rid of the teak   Cut down the bowrail, replaced all the fittings with stainless steel   Pulled out all the black plastic rod holders and got stainless steel, even found 2 a few inches shorter, so they dont go thru the top of the rod boxes. Be sure to chamfer all your screwholes other wise you'll *spidercrack the gelcoat. had to fix the gelcoat under all the old rodholders     | 
| 
 | 
 |