whoops
talk about a dilema. i building a deck on a realy nice house on the beach in pass christian. i was just setting here going over some paperwork (aaaarrrrrggghhhh!!!!) when i realized i messed up the price on this project. at my square foot price for this type of deck i should have charged the guy $14806.04 with tax. instead, not syre how, i charged him $23592.60. the guy didnt bat an eye when i gave him the price. he is a very wealthy man (oil man) and this is just one of his vacation homes. he has already signed the contract, made the deposit, and the project is well underway. should finish by the end of the week.
i pride myself on being an honest man. and we all know what the honest thing to do here is. but, we're talkin $8788.56! for me, all for me! i mean, this guy flies into town on his private jet. his watch cost more than my house! he owns one of the, if not the largest oilfield services companies in louisiana. i mean, that little bit of change aint nothin to him. but to me, $8788.56 is a butt load of money.
but, right is right, and wrong is wrong. what do y'all think?
|