View Single Post
  #306  
Unread 06-02-2007, 01:17 AM
Skools Out's Avatar
Skools Out Skools Out is offline
God
 
Join Date: Jul 2007
Location: Graham / Emerald Isle, NC
Posts: 5,926
Default Re: 21 Project Part 2 The Finish is Coming

Well got home ready to work on her and the floor was still soft so i had to do all i could without stepping on the gray.


so i installed the new brass floor drains



installed the pedestal back in (it's bolted in to a 3/8 thick steel plate i installed under the floor and threaded the holes in the steel to be able to replace the pedestal easy and solid.)




i installed the front floor hatch and insert box



and finally installed all the decals





sorry boys that's all i could reach so all i did hope to finish the punch list tomorrow.
__________________




1978 V20 Cuddy w/ 225 Johnson. And Several other boat's
Reply With Quote