Thread: Made the deal
View Single Post
  #15  
Unread 02-27-2004, 02:59 PM
bigshrimpin bigshrimpin is offline
God
 
Join Date: Mar 2003
Posts: 1,597
Default Re: Made the deal

Capt. Jerry - you've gotta fix the drain problem.

On other versions of the steplift there are thru hull's on both sides as described by CB above. The placement of these thru hull is slightly lower than the deck in each side. A rubber tube connects the thru hulls - so water on the deck drains of the side of your boat.

You can see the placement of the thru hulls in the picture here. (next to the strap)

__________________
1971 222 Hiliner
1973 23 Seacraft Center Console
1973 23 Seacraft Sceptre
1971 25 Seacraft Seafari
1972 28 Cary
Reply With Quote