Thread: Made the deal
View Single Post
  #13  
Unread 02-27-2004, 09:59 AM
chumbucket's Avatar
chumbucket chumbucket is offline
God
 
Join Date: Mar 2003
Posts: 5,067
Default Re: Made the deal

Unfortunately, the solution would involve drilling through your hull. You could drill through, epoxy the exposed wood, then install a through hull fitting imbedded in 3M 5200. Change the drain scuppers in the cockpit to ones you can attach a hose to the backside, then connect the cockpit drains with the through hull fittings. Just watch your water line on the through hulls for correct placement.
__________________
Heavily medicated for your protection.
Reply With Quote