View Single Post
  #5  
Unread 11-14-2016, 09:23 PM
Slightly_Twisted Slightly_Twisted is offline
Senior Member
 
Join Date: Nov 2007
Location: Bloomington, Indiana
Posts: 221
Default

it been a week or so. Things are really crazy around here with the start of hunting season and the end of football.

Got the linkage problems worked out I think. I just need to test it on the water. Getting close to being done with the bright work. I remade the rod-box trim, the front hatch rails, and the transom door. I had some mahogany left from some other things and was able to use the scraps. I'll take a few pics when I have a sec.

The next project I was thinking of going after was rewiring the boat. I've been trying to figure out what goes to what and what work and what doesn't. Seems like I cant get the switches to work and the lights. If I'm going to rewire some things I might as well do all the boat. I have 40ft of 2 awg left from my last boat and I think i would like to move the batteries to the cuddy. I'm going to put a bracket on it some time so I might as well do it now to get the weight forward.

Does anyone know or have pic of the stringers, under the red areas in the Pic below. I would like to cut a hatch into that area and rewire everything from there.

thanks
Attached Images
File Type: jpg wellcraft-v20-steplift-sport-cuddie-cabin-292257.jpg (59.0 KB, 29 views)
__________________


1986 V20 Cuddy in pieces



"WILD FINN"
Reply With Quote