Yesterday ended up being a bust for getting work done by the time I got home from getting steel and running errands, BUT I had a pretty good afternoon today. Got most of the firebox plate cut out, cut the opening in the drum for the smoke to go through, welded the top plate onto the drum for the smoke chamber, got 3 sides of the firebox welded on, 1 support leg welded on, and the legs are cut waiting for trimming and welding. Still alot of work left, but it's starting to take shape.
The 3 sides of the firebox welded on
Smoke chamber, reverse flow baffle, and the side of the smoke box
Smoker opening
Don't criticize my welds to much
__________________
2011 SUNDANCE B20CCR SKIFF, 2011 YAMAHA 90HP 4 STROKE, 2011 KARAVAN SINGLE AXLE ALUMINUM TRAILER, LOWRANCE ELITE-7 HDI, MINN KOTA RIPTIDE TROLLING MOTOR
2000CC HYDRA-SPORT 225+HP EVINRUDE SOLD
AND THE PINK JEEP!!!! R.I.P.
http://www.wellcraftv20.com/communit...ad.php?t=11664