Quote:
Originally Posted by tartuffe
I would say realistically around 60 hours cutting and shaping wood, bevels for the scab pieces, routing the tops of the stringers, and glassing in but thats not counting the 100 hours I stared at it. Measuring was the worst part and figuring out how everything was going to go together.
It was fun though once I started to view it as a hobby rather than a job.
|
thanks for the estimate. I figured there would be a lot of time involved. I am trying to gauge whether or not I will have enough time to have my boat floatable before june. That darn transom of mine ended up taking so much more time than what I anticipated and I am still not done with it. I might have to start working on my rig in the evenings also.
Thanks again.