View Single Post
  #6  
Unread 10-19-2013, 11:01 PM
spareparts's Avatar
spareparts spareparts is offline
God
 
Join Date: Oct 2006
Location: Raleigh, NC
Posts: 6,192
Default

the limit switches come with the measurements in the installation paperwork
I charge 3 hours labor(Merc flat rate) for a bellows job, if I add in the shift cable, it adds one hour, changing the gimbal, it depends on how bad its stuck(half hour and on up). To do everything on the transom, start to finish, 5 hours labor. I used to make good money doing them in fresh water, now that I work mostly with salt, it takes every bit of that time. If you add it all up, I think flat rate from Merc is something like 7 hours, spader puts it around 6
Reply With Quote