Thread
:
Got a lot done in 19 day's
View Single Post
#
12
08-15-2013, 09:25 PM
GREYWOLF
Senior Member
Join Date: Jan 2013
Location: MA CT line
Posts: 437
Lot's more done shake down tomorow afternoon
Well I got the rest of my (PRE-SHAKE DOWN LIST) acomplished today, and I am taking the
(NAUTI BUOY)
out tomorow to CONGAMOND lake for some trial runs , will post photos of that tomorow night, but here is what has been done since last post.
1) replaced the old fuel filler cap and vent (
both were SHOT and the hull needed glass repair were they were.)
Also since the prievious owner had replaced the fuel tank but not the lines a month before I bought her I changed them also.
2)I was tired of rain leaking into the cabin thru the anchor line cap so I went to HOME BOY DEPOT got some 6" pvc pipe with ennd flanges , some pvc contact cement and WALA now the water runs straight into the anchor rode locker and out to the bilge. I also thought that the rode locker needed some work so I re did it also ( resin and new piaint )
3) I had redone the teak wood a while back on the bow slide hatch cover but I decided to and more lacquer and put some tefalon film under the hatch to make it slide better and seal it .
4) AND NOW THE DECALS AND GRAFIX ARE ON !! I have a great sighn shop very close to my home , and they are GREAT Linda has been doing my rebuild boats for years now and she never stops to amaze me with what she can do from my simple ideas, let me know what you all think about the name and custom decals. I also was lucky when I went to register her I was able to get a set of #'s the work on the boat
MS 2084 VE since its an 84 20' v I think it works
5) also to any one having problems using 3M 5200 Try using this I can clean up my hands and tools ect. Its the only thing I have found that works
Last edited by GREYWOLF; 08-16-2013 at
04:04 PM
. Reason: photo
GREYWOLF
View Public Profile
Send a private message to GREYWOLF
Find all posts by GREYWOLF