Thanks, Benny! That is exactly what I wanted to know.
So midway between the last floor hatch and the transom? From the threads here I understand that as long as I retain the width of the floor hatch I will stay between the stringers? How and where do I run the line out from the bilge?
The guy who did the transom for me 10 years back put a second drain hole in below the original. He said water was getting held up below the original hole.
Sorry for the lack of pics. I hope to get her back home in the next week so I can post pics and get to work.
Dan
|