Thread: tackle station
View Single Post
  #7  
Unread 02-14-2012, 01:09 PM
RidgeRunner's Avatar
RidgeRunner RidgeRunner is offline
God
 
Join Date: Aug 2009
Location: Lakeland, Fl
Posts: 2,526
Default

The pictures. It is a big glovebox 18" deep. The right hand side could not be as deep due to rigging so I made it a place for wire access and terminator blocks.
1983 Wellcraft 001.jpg

1983 Wellcraft 002.jpg

1983 Wellcraft 003.jpg

1983 Wellcraft 005.jpg

The lower section is removable to gain access to the batteries. The time it took to make the faceplate was near 40 hours. Knowing that one mistake with hand tools and it goes to the scrap pile. The doors are 1/2" and the faceplate is 3/4" with a 1/4" lip recess to catch the door. Someone with a 3 axis CNC router could program the computer and be done in a couple minutes. Man I gotta clean the V. Not up to LS standards.
__________________

1996 -19' NV Flats 115 Mercury 4-stroke
1983 -20' Wellcraft Center Console 250 XS

Last edited by RidgeRunner; 02-14-2012 at 01:20 PM.
Reply With Quote