Quote:
Originally Posted by RidgeRunner
I think that will be enough. Consider what Wellcraft had on top of the deck, like .030" of Chopped Strand Matt. How thick was the glass where you cut the old floor out? My thinking, the floor is firmly glued in place atop the stringers so the most critical area is the joint around the perimeter of the new floor and any joints in the field.
|
Yea she's glued down good! So one layer of 1708 with tape on all joints and bonds. I'm gonna be returning this glass up the liner about 4 to 6 inches also.