Well today was kind of a bittersweet day, all that work on those stringers just to cover them up with plywood!!!!LOL!!! The sole was glued down today and the motor rigging ran. I have it ran to were changing teleflex is gonna be a cinch if it needs to be replaced. All holes cut were sealed with thicken resin and the pvc pipes through the floor were glued in to make them permenent.
|