View Single Post
  #88  
Unread 01-10-2012, 07:39 PM
Kracker Jack's Avatar
Kracker Jack Kracker Jack is offline
God
 
Join Date: Aug 2011
Location: va beach
Posts: 1,753
Default

The stringers are finally done and my last layer of 1708 is on the transom. All i have to do is put some thickened resin in the stringer drain holes then drill the holes 1 inch( I over drilled the holes 1 1/2 inch) to allow for a solid ring of glass around the drains to protect the raw wood. I also drilled my garboard plug a 1 1/2 and then used thickened resin reinforced with some chopped glass to fill the hole back and then drilled it 1 inch. A little more prep and then im ready for the sole. What should I do to water proof the bottom side of my 3/4 inch ply for my sole? 1 layer of csm?or should I just simply hotcoat it?
Attached Images
File Type: jpg 7.JPG (32.1 KB, 104 views)
File Type: jpg 8.JPG (38.0 KB, 90 views)
File Type: jpg 9.JPG (33.1 KB, 87 views)
File Type: jpg 10.JPG (27.1 KB, 90 views)
File Type: jpg 11.JPG (39.1 KB, 89 views)
Reply With Quote