View Single Post
  #12  
Unread 09-02-2011, 01:38 PM
RidgeRunner's Avatar
RidgeRunner RidgeRunner is offline
God
 
Join Date: Aug 2009
Location: Lakeland, Fl
Posts: 2,526
Default

PVC pipe passes through two of the the bulkheads. Wellcraft notched the stringer so they could run the rigging tube outside of the stringers and then they cut two of the sister stringers down the starboard side to get it to the stern. Patched up/replaced all that when the liner was out. Still required one notch in the top of the stringer to run the fuel fill and vent hoses. At least I sealed the exposed wood while I was there, Wellcraft never did.
__________________

1996 -19' NV Flats 115 Mercury 4-stroke
1983 -20' Wellcraft Center Console 250 XS
Reply With Quote