View Single Post
  #8  
Unread 01-05-2011, 10:37 PM
phatdaddy's Avatar
phatdaddy phatdaddy is offline
God
 
Join Date: Mar 2003
Location: south of I-10
Posts: 4,965
Default

skunk, this is what i did to allow the chain & rode to go directly to the anchor locker below the self in the cabin. it is a piece of 4" plastic drain tile that connects the underside of the cabin roof to the locker in the bow. also directs any water that comes into the deck pipe tothe bilge.





topside shot
Reply With Quote