View Single Post
  #4  
Unread 08-08-2010, 04:32 PM
Brody Brody is offline
Junior Member
 
Join Date: Oct 2009
Location: South East PA
Posts: 12
Default First Arjay pour

I elected to not raise the transom height due to added weight. Here is the pictures after the first pour. I am going to finish the rest with a second pour this week. I am going to drill several holes into the Arjay after it is set up so it forms a keyed fit for the second pour. I was attempting to do everthing at one time but there was no way I could block this with forms, It would have been a disaster. I had several small unseen cracks that leaked into the bilge and was a mess until it started to set up. After that mess I did not even attempt the forms and duct tape for the sides.

I am going to glass over the sides and drill several holes for venting air before the second pour. I will post final pics later.
Attached Images
File Type: jpg First pour 8-6-10 184.JPG (46.2 KB, 88 views)
Reply With Quote