I got chance to work on my V yesterday. I made a seal driver out of a piece of 2in pvc pipe and a pvc coupling and drove the seal in first. Then I slid the alignment tool into the coupling on the flywheel and slid the new gimble bearing down the tool till it bumped the housing. After I lined the grease hole in the bearing with the hole in the housing, I took the pvc driver and tapped the bearing right straight in till it bottomed out. It worked great! I used the new gaskets and O rings and slid the outdrive right in. Everything went really smooth. After greasing everything up, I put the trim cylinders back on and put the muffs on and fired it up. It ran slick as a whistle. I'm ready for the water!