I'm being optimistic with the "blood and scales". More realistic though it will be used as a beer cooler. No new pics yet. The other day I tabbed the fore and aft bulkheads to the remaining floor. I also tabbed in 2" strips of plywood around the floor cutout so when I put the floor back down it has something to rest on. I had to order a special low profile 1 1/2" 90 degree drain for the fishbox. It came in yesterday. Maybe today I will work on the fishbox plumbing. Tomorrow and Friday are supposed to be warmer. If thats the case I'm not going to work on the boat. I want to get out on my quad.
|