View Single Post
  #1  
Unread 07-08-2009, 06:46 PM
Shawsee Shawsee is offline
Senior Member
 
Join Date: May 2007
Location: Woodstock Ct
Posts: 392
Default Painted floor pictures

Before Duraback


After Duraback


Floor hatches made of composite deck material


Glued up with Gorilla Glue and screwed together with stainless #10 x 2" long flathead screws. These hatches are so solid I was amazed. Cost of material,$21.00 for composite material,$10.00 in SS screws.

__________________
1976 Wellcraft V-20 Steplift w/1983 175 HP Johnson
1973 Sears 12 ft. V bottom w/1958 3 HP Evinrude

"A boat is a hole in the water, surrounded by wood & fiberglass, into which one pours hard earned money into"

Last edited by Shawsee; 07-09-2009 at 08:05 AM.
Reply With Quote