![]() |
She is going for some plastic surgery...
Hi !!!
Pestanas, our V20, needs a makeover, the "surgeons" (me) check list : * New under coating ( antifoluling ) a most. * Remove all Teak, sand ( had been painted white by prior owner ), re-oil, reinstall. * Repair the sagging roof ( broken reinforcement beam inside roof ) NO IDEA YET !!! * Rewire all wiring from batteries to steering area. * Finally install ( properly ) the Garmin 76 and the 160 fish finder. * Install new Nav lights all around. * Replace all the mounting hardware for the bow`s handrail. * Install custom made step to help climb from deck to bow, next to the cabin door. * Replace water impeler on the Yamaha 200. * Install a back up bilge pump. * Have canvas made for forward section, from existing canvas roof to bow hand rail. *____________________________________. *____________________________________. You know, the minute you loosen a screw, the rest just falls appart.... Will take pictures ( before/after ) and hopefully learn to post them. Work to start as soon as I get back home from Oklahoma City ( by the way, great SUPER friendly people in OK, OK is an OK place to be !!! I can not find easier going people anywhere else I have been ). Will keep you posted. JT |
As far as the step up to above the cuddy , there was a post about a flip down step that was the same as what was on semi's and busses to gain access. Can't find the post. It was clean, easy and stainless.
|
Found a picture.
http://i175.photobucket.com/albums/w...3/d_1175-1.jpg |
1 Attachment(s)
That was me with the mast step. Or as my wife calls it "the old man step"
|
Is there a site he can buy this from?
|
|
Thanks for the info !!!
Thats a great idea. I might use that. What I had in mind is a small box with a teak hinged top, kind a like a battery box size, so I can use it to store a spare battery. JT |
| All times are GMT -5. The time now is 08:08 PM. |
Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.