![]() |
how would i go about back flushing from the thermastat
|
Quote:
|
thanks for the help guys i got the impeller done but the trick was to get the shift linkage hooked up right the first time i thought i had it was all reverse the second nothing the third lower unit wouldnt go on the last time an employee i call rusty bucket thought it would be easier to just go in from the transum side of the lower unit to line up the shift linkage
|
| All times are GMT -5. The time now is 04:33 PM. |
Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.